Llogara Tunnel to Be Ready by June

The tunnel of Llogara in Albania is expected to be opened by June 2024. This is what at least the Director of the Project, Ardino Halimi aims and hopes to realize for all the user of this road to seaside.

According to him, the Llogara tunnel will have two tunnels, one as main tunnel and another one for emergencies.

"The tunnel will be long 7.42 km. So far it is realized 95% of the project, and only 5% remained. I hope it will be ready by June," said Director Halimi.

He added that the tunnel will have 11 parking lots and places, 5 for vehicles and 6 for pedestrians.